Here is the stove prior to the start of the reconditioning. At this point I have all my tools and floor protection in place. I have slid a sheet of 26 gauge sheet steel between the stove and the hearth, the sheet steel overlaps the floor protection.

This entry was posted
on Saturday, April 26th, 2008 at 11:44 am and is filed under Uncategorized.
You can follow any responses to this entry through the RSS 2.0 feed.
You can leave a response, or trackback from your own site.